Scope of Work for a Residence in Vero Beach: The Camerons
This project entails a complete renovation of the master bathroom. We will retain and refurbish the existing vanities, toilet, and tub, while all other elements will be newly installed.:

This renovation is poised to deliver a significant transformation, enhancing both the functionality and aesthetics of the master bathroom.
|
– **Demolition**:
– Removal of all existing flooring
– Complete extraction of tile within the shower
– Dismantling of existing vanities
– Disposal of countertops and plumbing fixtures
– Removal of the glass partition
– Elimination of all wallpaper
– **Installation**:
– Installation of 32” x 71” tiles extending to the ceiling
– Installation of quartz mitered countertops and quartz around the tub area and tub deck
– Application of new wallpaper in the toilet room
– Construction of a custom shower featuring matching tile, a new rain shower head, an additional shower head, and a handheld option
– Installation of a new glass partition
– Replacement of all faucets
– Complete interior painting from top to bottom / Wallpaper installation in toilet room
– Installation of new flooring
– Upgrading to new lighted mirrors and lighting features
|
BEFORE:
DEMO:
TILE INSTALLATION:
TILE COMPLETION/ COUNTERTOP INSTALLATION:
WALLPAPER INSTALLATION : BEFORE – DURING – AFTER
COMPLETED