• Island Homes & Renovations, Inc BBB Business Review
  • Bathroom Remodeling Project : The Refner’s

    Refner Scope of Work:

    Shower Area Overhaul

    • Shower Demolition: We’ll begin by demolishing the old shower insert and two pieces of wall, clearing the way for a stunning, brand-new shower design.
    • Two-Tier Niche: A custom two-tier niche will be installed on the left side of the shower, providing both storage and style for your shower essentials.
    • Corner Bench: A large, luxurious corner bench will be added to create a spa-like experience, giving you a comfortable spot to relax.
    • Shower Head Upgrade: The shower head will be moved up to standard height, ensuring a perfect shower experience every time.
    • Concrete Board & Waterproofing: We’ll install concrete board in the shower area and waterproof it to ensure durability and longevity.
    • New Shower Tile: The entire shower will be tiled from floor to ceiling with fresh, stunning new tile, creating a sleek, modern look.

    Vanity & Sink Area Update

    • Vanity Install: A brand-new vanity will be installed, creating a fresh focal point for your bathroom and providing much-needed storage.
    • Faucet Install: New faucets will be installed to complement the updated vanity, bringing a modern touch to the space.
    • Electrical Upgrades: We’ll add one new light in the shower area, plus a new switch and receptacle around the sink area, all with fresh, modern faceplates.

    Flooring & Wall Updates

    • Floor & Baseboard Removal: The old floor and baseboards will be demolished to make way for new, sleek flooring and baseboards.
    • Tile & Wainscotting: We’ll install beautiful new tile on the floor and up to the ceiling in the shower area. Wainscoting with 1×4 base and verticals will be added to the toilet wall, adding character and charm to your bathroom.

    Finishing Touches

    • Ceiling Touch-Up: Any affected areas, such as ceiling spots from demolition, will be patched and textured to match the existing ceiling for a flawless finish.
    • Dispenser Removal: The old towel and toilet paper dispensers will be removed to give the space a cleaner, more streamlined look.
    • Paint Refresh: We’ll paint the entire bathroom from top to bottom, ensuring the space looks fresh, bright, and welcoming.
    • New Baseboards: Finally, we’ll install new 1×4 baseboards, bringing the whole room together with a polished, modern feel.
      This renovation will turn your bathroom into a luxurious and functional oasis that you’ll love to spend time in. With a beautiful new shower, vanity, and sleek finishes throughout, every detail will be carefully designed to create a cohesive, high-end look. We’re thrilled to get started on this exciting project and can’t wait for you to experience the stunning results! Stay tuned!

    BEFORE:


    What’s next: Demo